top of page
  • Poza scriitoruluiDan Eremciuc

Calendar dates

Day One:


Get a couple shots mostly to assess the difficulty and complexity of our ideas, more of a benchmarking day. We planned on filming near our schools park as its conveniently close and has long sidewalks which we needed, this coupled with the lush flora creates an adequate atmosphere,, only slightly contrasted by our next location(from day 2).

We kept the equipment to a minimum as we only really needed one camera, the ones from our phones sufficed for momentarily.



Day two:


On day two we planned to do the bulk of the film therefore we will bring all our equipment with us(lens, flashlight, cameras, precautionary weather robes). Our second location is near a lake, still fairly populated yet this won't deter us. We plan on getting more walking/jogging shots of the character along with some more postmodern clips of random objects to further fuel our artistic image/branding.


We haven't set specific calendar dates for these 2 days as we decided collectively to meet up whenever we are free as we did not have many time constraints.

2 afișări0 comentarii

Postări recente

Afișează-le pe toate

Graphic elements

The only graphic elements used in both digipaks are the barcodes, which are the standard model, we wanted to choose a more rectangular ...

Commenti


bottom of page